{"id":322,"date":"2026-02-01T19:20:01","date_gmt":"2026-02-01T19:20:01","guid":{"rendered":"https:\/\/win2026.nl\/?page_id=322"},"modified":"2026-02-01T19:20:01","modified_gmt":"2026-02-01T19:20:01","slug":"guidelines-for-company-case-presentations","status":"publish","type":"page","link":"https:\/\/win2026.nl\/index.php\/guidelines-for-company-case-presentations\/","title":{"rendered":"Guidelines for Company Case Presentations"},"content":{"rendered":"\n\n<div style=\"max-width: 750px; margin: 3rem auto;\">\n\n  <h2>Guidelines for Company Case Presentations<\/h2>\n\n  <p style=\"font-size:1.15rem; line-height:1.6;\">\n    These guidelines aim to ensure high-quality, experience-based contributions that stimulate knowledge exchange while avoiding commercial presentations. The session is intended to promote open exchange and shared learning between industry and the wider industrial water community.\n  <\/p>\n\n  <h3>Purpose of the session<\/h3>\n  <p style=\"font-size:1.1rem; line-height:1.6;\">\n    The company case session provides a platform for sharing practical experience from real industrial water management cases. Presentations should focus on what was done, why, and what was learned, rather than on promoting products or services.\n  <\/p>\n\n  <h3>Expected content<\/h3>\n\n  <p><strong>1. Context and problem definition<\/strong><\/p>\n  <ul>\n    <li>Industrial sector and application context<\/li>\n    <li>The water-related challenge addressed (e.g. water scarcity, discharge limits, reuse, cost, compliance)<\/li>\n    <li>Key constraints (regulatory, operational, site-specific)<\/li>\n  <\/ul>\n\n  <p><strong>2. Solution approach<\/strong><\/p>\n  <ul>\n    <li>Overall approach or concept adopted<\/li>\n    <li>Rationale for choosing this approach over alternatives<\/li>\n    <li>Role of technology, process design, and\/or operational measures<\/li>\n  <\/ul>\n\n  <p><strong>3. Implementation and operation<\/strong><\/p>\n  <ul>\n    <li>Scale and maturity (pilot, demonstration, full-scale)<\/li>\n    <li>Key design or operational choices<\/li>\n    <li>Challenges encountered during implementation and operation<\/li>\n    <li>How these challenges were addressed in practice<\/li>\n  <\/ul>\n\n  <p><strong>4. Performance and outcomes<\/strong><\/p>\n  <ul>\n    <li>Quantitative or qualitative results where possible (e.g. water savings, compliance, efficiency, costs)<\/li>\n    <li>Comparison with the baseline or previous situation<\/li>\n    <li>Observed limitations or uncertainties<\/li>\n  <\/ul>\n\n  <p><strong>5. Lessons learned and transferability<\/strong><\/p>\n  <ul>\n    <li>What worked well and why<\/li>\n    <li>What did not work as expected<\/li>\n    <li>Key lessons learned<\/li>\n    <li>Conditions under which the solution is transferable to other sites or sectors<\/li>\n  <\/ul>\n\n  <h3>What to avoid<\/h3>\n  <ul>\n    <li>Extended company introductions<\/li>\n    <li>Product catalogues or feature lists<\/li>\n    <li>Marketing language or comparative claims<\/li>\n    <li>Calls to action (e.g. visiting booths, contacting sales)<\/li>\n  <\/ul>\n\n  <p style=\"font-size:1.05rem; line-height:1.6;\">\n    (Company names or technologies may be mentioned briefly for clarity but should not dominate the presentation.)\n  <\/p>\n\n  <h3>Presentation format<\/h3>\n  <ul>\n    <li>Typical presentation length: 15 minutes + 5 minutes discussion<\/li>\n    <li>Suggested structure:\n      <ol>\n        <li>Context and problem<\/li>\n        <li>Solution approach<\/li>\n        <li>Implementation and operation<\/li>\n        <li>Results and performance<\/li>\n        <li>Lessons learned and outlook<\/li>\n      <\/ol>\n    <\/li>\n  <\/ul>\n\n  <h3>Evaluation criteria<\/h3>\n  <ul>\n    <li>Relevance to the conference themes<\/li>\n    <li>Technical and practical depth<\/li>\n    <li>Transparency and credibility<\/li>\n    <li>Learning value and transferability for the audience<\/li>\n  <\/ul>\n\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Guidelines for Company Case Presentations These guidelines aim to ensure high-quality, experience-based contributions that stimulate knowledge exchange while avoiding commercial presentations. The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-322","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/win2026.nl\/index.php\/wp-json\/wp\/v2\/pages\/322","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/win2026.nl\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/win2026.nl\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/win2026.nl\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/win2026.nl\/index.php\/wp-json\/wp\/v2\/comments?post=322"}],"version-history":[{"count":1,"href":"https:\/\/win2026.nl\/index.php\/wp-json\/wp\/v2\/pages\/322\/revisions"}],"predecessor-version":[{"id":323,"href":"https:\/\/win2026.nl\/index.php\/wp-json\/wp\/v2\/pages\/322\/revisions\/323"}],"wp:attachment":[{"href":"https:\/\/win2026.nl\/index.php\/wp-json\/wp\/v2\/media?parent=322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}